Year: 2023
Enterprise nature: Private enterprise
Project location: Xiangcheng District, Suzhou
Final capacity (MW): 1.705
Component: 670W single crystal component
Inverter: AUX 110kW
Grid connection mode: 380V grid connection
Safety technology: meeting the requirements of photovoltaic design specifications
Technical difficulties: installation of trapezoidal tile roof fixtures, roof waterproofing, reinforcement design and construction difficulties
Annual power generation (10000 kWh): 180.71569