Year: 2023
Enterprise nature: Private enterprise
Project location: Yixing, Wuxi
Final capacity (MW): 1.400
Component: 670W single crystal component
Inverter: Huawei 110kW
Grid connection mode: 380V grid connection
Safety technology: meeting the requirements of photovoltaic design specifications
Technical difficulties: Saddle plate opening, bracket stability design, construction component handling
Annual power generation (10000 kWh): 148.4